Tool 4.6 Induction checklist
Tool 4.6 Induction checklist
This induction checklist for shearing is an example of a procedure. This procedure ensures that all new employees are correctly inducted into the shearing shed. It is a place to list all the key things you need to cover, then document that the employee/s know and understand the expectations around these items.
A checklist like this saves you time, saves your memory and aids safety outcomes.
This checklist should be used by the employer with the shearing team to ensure all important work practices are identified and that all shed staff are aware of work practices and safety information. It also gives the shed staff a chance to raise any safety concerns or requirements with the employer.
The AWI SafeSheds Induction Checklist covers:
- The shearing shed
- Wool and press rooms
- Machinery and equipment
- Overhead gear and shearing plant
- Handpieces
- Grinders
- Wool press
- Tool and equipment storage
- Electrical safety
- Work practices
- Penning
- Wool preparation and wool pressing
- Protective clothing
- Hygiene
- Fitness, warming up and down
- Drugs, alcohol and smoking
- Dogs and visitors
- Emergencies and first aid
- Travel risk management systems and signage
- General working conditions
- Water
- Heat and cold
- Diseases from animals
- Noise
Download the AWI SafeSheds Induction Checklist.
Download the full AWI SafeSheds program.